Home 9 Project 9 London Borough of Islington

Braithwaite House

Braithwaite House is a 19-storey residential block located close to the City of London. Breyer was approached at only 3-days’ notice to commence pre-construction work and emergency removal of Aluminium Composite Cladding. We worked over time with our established and trusted supply chain to meet this challenge. Our dedicated Design Manager collaborated with LB Islington, their Contract Administrator and Building Control to produce an A1 non-combustible design in what was a relatively unclear arena only a month after the Grenfell tragedy.

As well as replacing the façade of the building, the programme of works included emergency ACM removal, window overhaul, fire safety doors and other solutions, concrete repairs and validation of FRA surveys. Due to the lack of site space, Breyer staff used public transport and bikes for travel to work and our site offices comprised of two-storey containers. What’s more, with considerably restricted access, we used scaffold solutions alongside mast climbers to ensure works could be carried out safely.

Key Facts

Contract Name: 
Braithwaite House
Client: 
London Borough of Islington
Value: £1.3m
Works: Cladding replacement

Breyer Renew Logo

Braithwaite House

Breyer Roofing Logo

Braithwaite House is a 19-storey residential block located close to the City of London. Breyer was approached at only 3-days’ notice to commence pre-construction work and emergency removal of Aluminium Composite Cladding. We worked over time with our established and trusted supply chain to meet this challenge. Our dedicated Design Manager collaborated with LB Islington, their Contract Administrator and Building Control to produce an A1 non-combustible design in what was a relatively unclear arena only a month after the Grenfell tragedy.

As well as replacing the façade of the building, the programme of works included emergency ACM removal, window overhaul, fire safety doors and other solutions, concrete repairs and validation of FRA surveys. Due to the lack of site space, Breyer staff used public transport and bikes for travel to work and our site offices comprised of two-storey containers. What’s more, with considerably restricted access, we used scaffold solutions alongside mast climbers to ensure works could be carried out safely.

More Case Studies

Evolve Housing/Archway

London Borough of Islington

London Borough of Lambeth

Wandle Housing Association

My Base 1 RTM Company LTD

Oxford City Council

If you’d like to find out more about working with Breyer Renew, please contact us.
Breyer Group Logo
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.